0407cct Bag38 Z
38. Because Tony installed all the ART components and attached all the air lines -- as per the comprehensive ART instructions -- he began to wire the installation. In this photo, he put one of the supplied wiring looms in the conduit and wrapped electrical tape around the conduit. Next, Tony fed the wire-filled conduit into the framerails and finished wiring the system.
|
|